Skip to content
nuqo

Quote wire harnesses in minutes, not days.

Upload a request. Nuqo prices it. You decide.

Two real RFQs free, under NDA.

nuqo
Q-2041Sensor control assemblyDraftFinalize
112233445566778899101011111212AABBCCDDEEDRAINX1X2X3W1W2W31400 ±15800 ±10600 ±10440 ±10123456715VIEW AX1 MATING FACE12VIEW BX3 MATING FACEVIEW CX2 MATING FACEREVDESCRIPTIONDATEAINITIAL RELEASE2026-03-02BW3 LENGTH 420 → 4402026-09-14NOTES1. ALL DIMENSIONS IN mm. DRAWING NOT TO SCALE.2. LENGTH TOLERANCE ±10 mm UNLESS STATED.3. MARKER SLEEVES 30 mm BEHIND EACH BACKSHELL.4. SHIELD OF W1/W2 TERMINATED AT X1 AND X2.5. 100 % CONTINUITY TEST.WIREFROMTOmm²COLOURTWISTLENGTHW10X1:2X2:30.25RD—1400W11X1:3X2:20.25BU—1400W12X3:2X1:50.50BK—1240W13X3:1X1:90.50WH—1240ITEMPART NO.DESCRIPTIONQTY1NQ-1001D-SUB PLUG, 9 POS, CRIMP12NQ-1002D-SUB SOCKET, 15 POS, CRIMP13NQ-1003CIRCULAR PLUG, 4 POS, STRAIGHT14NQ-2001CABLE 8 × 0.25 mm², SHIELDED1.4 m5NQ-2003CABLE 4 × 0.25 mm²0.44 m6NQ-3001HEAT-SHRINK BOOT, T17NQ-3002MARKER SLEEVE3TITLESENSOR CONTROL ASSEMBLYDRAWING NO.NQ-0001SCALENTSUNITSmmREVBSHEET1 / 3DATE2026-11-09SAMPLE DRAWING · ALL DATA MADE UPX3W12W3
Sample drawing, made up

Sample drawing, sheet 1 of 3

Made up for this page: no customer, part or price on it is real.

Nuqo reads a drawing and prices the quote

A recording of the app, shortened. The drawing is made up, the voice AI-generated.

Parts 6 of 24 lines
PartQuantityStatus
Circular plug, 4 pins250 pcMatched
Receptacle housing, 4 positions500 pcMatched
Cable, 4 × 0.25 mm²300 mAssumed
Crimp terminal, 20–24 AWG2,000 pcMatched
MustCable W3 · Sheet 1, zone C4

Is cable W3 shielded?

The drawing shows a drain wire at X3. The parts list names an unshielded cable.

Price includes the shield termination

Sample quote. Parts and prices for illustration.

  • The whole request

    PDF drawings, Excel parts lists, images and emails, read together.

  • 8M+ components

    Parts to source from, behind your own price lists.

  • Your prices, your plant

    Your catalogs first. Labor at your work centers and your rates.

  • You decide

    Every assumption is marked. Nothing leaves until you finalize it.

The problem

Most of a quote is typing.

The inquiries nobody gets to are the ones you lose.

  • Read the drawing

    Every connector, wire and length, typed in by hand.

  • Find every part

    Supplier by supplier, again whenever the quantity changes.

  • Work out the labor

    From old quotes and the memory of whoever did the last one.

  • Chase what’s missing

    Gaps surface late, sometimes after the price went out.

On the drawing

Check it on the drawing.

See what Nuqo read, on your customer’s own drawing, where you’d check it anyway.

  1. Every fact with its source and a pencil to correct it. Hover for picture and price.

  2. Length as dimensioned, where it starts and ends, and what was assumed.

  3. From a parts list line, question or labor step, one click rings the spot.

Try it on your own drawing
Sheet 1 of 3
112233445566778899101011111212AABBCCDDEEDRAINX1X2X3W1W2W31400 ±15800 ±10600 ±10440 ±10123456715VIEW AX1 MATING FACE12VIEW BX3 MATING FACEVIEW CX2 MATING FACEREVDESCRIPTIONDATEAINITIAL RELEASE2026-03-02BW3 LENGTH 420 → 4402026-09-14NOTES1. ALL DIMENSIONS IN mm. DRAWING NOT TO SCALE.2. LENGTH TOLERANCE ±10 mm UNLESS STATED.3. MARKER SLEEVES 30 mm BEHIND EACH BACKSHELL.4. SHIELD OF W1/W2 TERMINATED AT X1 AND X2.5. 100 % CONTINUITY TEST.WIREFROMTOmm²COLOURTWISTLENGTHW10X1:2X2:30.25RD—1400W11X1:3X2:20.25BU—1400W12X3:2X1:50.50BK—1240W13X3:1X1:90.50WH—1240ITEMPART NO.DESCRIPTIONQTY1NQ-1001D-SUB PLUG, 9 POS, CRIMP12NQ-1002D-SUB SOCKET, 15 POS, CRIMP13NQ-1003CIRCULAR PLUG, 4 POS, STRAIGHT14NQ-2001CABLE 8 × 0.25 mm², SHIELDED1.4 m5NQ-2003CABLE 4 × 0.25 mm²0.44 m6NQ-3001HEAT-SHRINK BOOT, T17NQ-3002MARKER SLEEVE3TITLESENSOR CONTROL ASSEMBLYDRAWING NO.NQ-0001SCALENTSUNITSmmREVBSHEET1 / 3DATE2026-11-09SAMPLE DRAWING · ALL DATA MADE UPX3W12W3
Sample drawing, made up

Sample drawing, sheet 1 of 3

Made up for this page: no customer, part or price on it is real.

PartQuantityStatus
250 pcMatched
1,250 mAssumed
300 mAssumed

X3 · Circular plug, 4 pins

Connector, read from sheet 1

  • Positions4Sheet 1, zone C4
  • Part numberNQ-1003Drawing table, item 3
  • DescriptionCircular plug, straightDrawing table, item 3
€38.20 per pcYour catalog

The price

Know what every price rests on.

Nuqo marks what it assumed and asks only what it can’t settle.

What each answer costs

See what a question is worth before you spend time on it. Largest first.

MustCable W3 · Sheet 1, zone C4

Is cable W3 shielded?

The drawing shows a drain wire at X3. The parts list names an unshielded cable.

Continuity test: every assembly or a sample?−€760.00
Is a test report required with delivery?+€100.00

The range still open

What’s still open shows as a range. Answer, and it narrows.

Total
€24,160
€96.64 per assembly · quantity 250
Price between
€23,400€26,000

Try any quantity

The customer asks for 500? See the price before you touch the quote.

QuantityPer assemblyWhole order
€118.40€11,840.00
Requested€96.64€24,160.00
€88.10€44,050.00
€81.35€81,350.00

Every change, named

Who changed what, what it did to the price, and a way back.

  • Tin plating on X7 terminals confirmedJ. Keller, today 10:42
    +€210.00
  • Terminal X7 swapped for your own partJ. Keller, today 10:38
    −€64.00
  • Insulation FLRY-B on 12 wiresNot stated on the drawing
    Assumed

Your setup

Your prices first, then the market.

8M+

components to find parts from, after the catalogs you already buy from.

Circular plug, 4 pins

NQ-1003

Matched
Purchase price
€38.20
Market
€43.10
Whole order
€9,550.00
Lead time
3 weeks

Buying order

SupplierFor 250 pcLead time
1Your catalog€38.20 per pc3 weeks
2Your supplier€41.75 per pc6 weeks
3Market€43.10 per pc2 weeks
4Market€44.60 per pc2 weeks

Decided by your purchasing rule: your catalogs first.

  • Your price lists

    Read first. A new version asks only about what changed.

    Connectors 2026
    Version 3
    Signed off
    12 Oct
  • Your plants

    Priced at a plant’s work centers and rates. Compare plants on one quote.

    Plant North
    €96.64 per assembly
    Plant East
    €91.20 per assembly
    Difference
    €5.44 per assembly
  • Your labor

    Step by step, by work center: see where the time goes.

    Cutting
    14.5 h
    Crimping
    96.0 h
    Testing
    42.0 h
  • Your ERP

    Connect over an API, signed in with a key. Developer docs

    Sync parts
    Remove parts
    Read net need per quote

The big ones

Very large drawings, too.

Dozens of connectors, hundreds of wire ends, sheet after sheet.

How Nuqo reads them

The drawings where retyping hurts most are the ones Nuqo reads too: segment by segment, and it shows you each one on the sheet.

Bring your largest drawing to a test run
112233445566778899101011111212131314141515161617171818191920202121222223232424252526262727282829293030AABBCCDDEEFFX1X2NQ-1002W4X3NQ-10035W5X4NQ-1004W6X5NQ-1005X6NQ-1006W7X7NQ-1007W8X8NQ-10089W9X9NQ-1009W10X10NQ-101011W11X11NQ-1011X12NQ-1012W12X13NQ-101313W13X14NQ-1014W14X15NQ-101515W15X16NQ-1016W16X17NQ-1017X18NQ-1018W17X19NQ-1019W18X20NQ-102019W19X21NQ-1021W20X22NQ-102221W21X23NQ-1023X24NQ-1024W22X25285180140175180140175180140175180140175180140175180140175345WIREFROMTOmm²COLOURLENGTHW30X1:1X5:10.35BK1820W31X2:2X6:20.35RD1725W32X3:3X7:30.35BU1630W33X4:4X8:10.35GN1535NOTES1. ALL DIMENSIONS IN mm. NOT TO SCALE.2. TOLERANCE ±10 mm PER SEGMENT.3. BOOT EVERY BREAKOUT. SEE SHEETS 2–6 FOR WIRE LIST.TITLEMAIN HARNESS, CONTROL CABINETDRAWING NO.NQ-0090SHEET 1 / 6 · SCALE NTS · UNITS mmSAMPLE DRAWING · ALL DATA MADE UPX1X2X3X4X5X6X7X8X9X10X11X12X13X14X15X16X17X18X19X20X21X22X23X24X25
Sample drawing, made up

How it works

Nuqo types, you decide.

  1. Upload the request

    Whatever the customer sent, as it came.

    DrawingPDF
    Parts listExcel
    Customer’s emailEmail
  2. Nuqo works the quote

    Reads, builds the parts list, finds parts and prices, works out the labor.

    Parts list built
    Parts and prices found
    Labor worked out
    YouUse our own crimp contact on X3.
  3. Answer the questions

    Only what it can’t settle, largest price effect first.

    MustSheet 1, zone C4

    Is cable W3 shielded?

    Shielded+€1,740.00
    UnshieldedNo price effect
  4. Finalize and send

    You check what goes out and send it as PDF or Excel.

    QuotePDF
    QuoteExcel
    Finalize
More on each step
  • While Nuqo works the quote: watch it, or tell it things in plain words.
  • When you answer: point at a line or a spot on the sheet if that’s quicker.

What shops say

“Even an inquiry with 200 drawings was extracted and calculated cleanly. I wouldn’t have expected that.”
Technical Sales Director
  • “The price Nuqo calculated [in a test run] comes very close to our current project price.”
    Team Lead, Project Management
  • “Being able to calculate any batch size in seconds, with the right volume pricing and scale effects factored in, is worth its weight in gold.”
    Managing Director
  • “The review-question feature is exactly the right approach. We want to know what happens under the hood and where to look more closely, and the questions are sensibly prioritized. That’s excellent.”
    Technical Project Manager

Trust and security

What you upload stays yours.

How we handle your data
  • An NDA comes first

    We sign before you share a single drawing.

  • Where your data lives

    Your documents, quotes, and account data are stored and hosted in the EU. The AI that reads your documents runs in the EU and the USA, or in the EU only if you ask.

  • Not used to train AI models

    We never train models on your documents.

  • Encrypted and GDPR-ready

    Encryption in transit and at rest, and a signed DPA.

  • A person confirms every quote

    Nothing goes to your customer until you finalize it.

Pricing

Per BOM line, not per seat.

Every quoting feature in every plan.

PlanUsersBOM linesWhat you get
Team2 users500 BOM lines / monthEvery quoting feature
Business4 users1,000 BOM lines / monthEvery quoting feature · Standard ERP connector · Extended onboarding
EnterpriseCustom usersCustom volumeCustom SLA & contract · Custom ERP & PIM integration · On-premise / private cloud

Once you've used your allowance, you simply keep quoting — each extra line is billed at a 20% surcharge on your plan's per-line rate. No hard stop, no lockout mid-quote.

See pricing

Two real requests, calculated free.

  • An NDA comes first: we sign before you share a single drawing.
  • A live walkthrough of every number and every decision.
  • No setup, no integration, no commitment.